Commissioned by Kirby Group Engineering, we have supplied the complete air technical installation for a laboratory in Boxmeer. In the initial phase, clear and concrete agreements were made regarding the expectations in the field of engineering, production and logistics. It was a big challenge to supply large numbers of high-purity air technology products in a very short period. Thanks to clear and above all close cooperation, all deadlines have been met to date. This was the very first project that we have carried out in collaboration with the Irish organization Kirby Group Engineering. It has been a seamless and reliable cooperation, where there is good perspective for both parties with an eye on the future.

Indicatiecijfers

8.300m² Rectangular galvanized ductwork
2.000m¹ Circular ductwork
Air tightness Class C
Level of cleanness High
Duration of 4 months