Plukon Food Group

Plukon Food Group in Wezep was startled by a major fire in March 2017. The damage seemed to fall in the first instance, but the consequences turned out to be disastrous. Because the entire factory was covered in soot, no food could be produced here. It was decided to demolish the factory and replace it with a new production, storage and distribution center, which was completed at the end of April 2018. Vink Systemen BV, together with various other companies from the Vink Group, was closely involved in the realization of the Plukon Food Group project.

Project information:

  • Project name: Plukon Food Group
  • City: Wezep
  • Market segment: Utilities construction/renovation
  • Client: Induct Industrial Contracting
  • Delivery: April 2018

Figures:

  • 2.300m² RVS 304 duct work
  • 2.500m² vapour-tight insulation
  • Pack of 32 prefab parts and extra assembly

Magazine ‘Installatie & Bouw’

A nice article about the project has been written by trade journal ‘Installatie & Bouw’, in edition 2 2018. You can read the article here.