The Installatie en Bouw magazine features a nice article about Vink Systemen’ work on the Rotterdam Ahoy Convention Centre (RACC) project. Read the full article below:

‘THE ROTTERDAM AHOY CONVENTION CENTER IS A GREAT PROJECT IN EVERY WAY’

In Rotterdam, the finishing touches are being put on the construction of the Rotterdam Ahoy Convention Centre, scheduled to open its doors in September. The expansion includes a unique hall, RTM Stage, which can be used as an auditorium and concert hall. The 2nd and 3rd floors will have as many as 35 breakout rooms that can be used separately or together. It also creates an entirely new entrance building from which Ahoy Plaza, RTM Stage, the exhibition and event halls, Ahoy Arena and all the new breakout rooms are accessible. The design for the expansion was created by Kraaijvanger Architects. Hart van Zuid VOF (Heijmans/Ballast Nedam) is responsible for implementation. On behalf of this contractor combination, Vink Systemen is providing the production, delivery and assembly of the complete air technical installation.

“The Rotterdam Ahoy Convention Centre is a great project in every way,” says Marc Oudt on behalf of Vink Systemen. “Because not only are we allowed to produce, supply and assemble large numbers of air ducts, we also have to deal with large duct diameters, large air volumes and large heights of up to about 25 meters. In total, we assemble approximately 25,000 m² of rectangular galvanized steel ductwork in new buildings. Much of this ductwork remains in sight, but is barely visible because of the large ceiling heights. The air ducts that do catch the eye are painted in various RAL shades in our own paint shop in Katwijk.”

Aluminum ductwork will be installed in the kitchens. In addition, Vink Systemen supplies various walkable discharge grilles, plenum boxes and soundproof distribution plates. “On the roof of the Rotterdam Ahoy Convention Centre, we mount approximately 3,000 m² of roof channels, which are finished with aluminum stucco cladding,” Oudt says. “As insulation material for the interior, 18,000 m² of Isover Climcover Lamella glass wool blankets (25 mm) were chosen.” To prevent reverberation in the large rooms, several partitions with sound absorbers will be realized. “Because of the great heights at which these silencers must be mounted, we decided to put the silencers on first, and then the building contractor built his walls around the silencers.”

To transport all the materials from Vink Systemen to construction, a total of nearly 200 truck trips are required. “Because the building is suitable for trucking in, we can unload the air ducts very close to the assembly site. All ducts are insulated on the ground before being lifted into the steel structure using aerial platforms, hoists and elevator platforms. To manage this process, sophisticated logistics and project coordination are indispensable. Not only with our own people, but also with the contractor combination and the fitters of the sprinkler pipes and cable trays. In this project, all disciplines work in tandem in a workable schedule. This allows us to work not only efficiently, but also safely at heights. Hardly any changes were made during execution, so schedules and processes were not delayed. The design was very well thought out in advance. Moreover, the common interest is always paramount and practical decisions are made. That makes Hart van Zuid VOF a fine client to work for.”

This article can be found on page 106 of installation and construction magazine – Text Lieke van Zuilekom

Stay up to date!

Our recent news

Image
28 February 2023

Work Planner


Vink Systems is a project organization in air technology and part of The Vink Group. We design, supply, install and maintain air ducts and air
Read more
Image
7 February 2023

Metalworker


Job Description As a metalworker, you will be working with metal on a daily basis. You will weld, set, roll, cut or grind various types
Read more
Image
7 February 2023

Chief mechanic (assembly)


Together with your team you will work throughout the Netherlands and sometimes abroad on beautiful projects. You celebrate successes with colleagues and put a smile
Read more
Image
7 February 2023

Mechanic (assembly)


Independently or in a team you will work throughout the Netherlands and sometimes abroad on beautiful projects, celebrate successes with colleagues and put a smile
Read more
Image
7 February 2023

Prospective Mechanic (assembly)


Together with an experienced mechanic, you will work throughout the Netherlands and sometimes abroad on beautiful projects. You celebrate successes with colleagues and put a
Read more
Image
7 February 2023

Junior Work Planner


As a junior work planner, you will ensure that our projects are well prepared during the design phase, but also that projects run smoothly during
Read more
Image
27 June 2022

Nice stake in largest construction projects in the Netherlands


In 2021, Vink Systemen had a nice 10% share in the largest construction projects in the Netherlands. Cobouw50 Projects is a new initiative by Cobouw
Read more
Lasersnijmachine moderniseert ons snijproces
13 June 2022

Laser cutting machine modernizes our cutting process


The website www.metaalnieuws.nl and www.laserbendingmachines.com published a nice article regarding our machinery. The purchase of a laser cutting machine modernizes the cutting process and our
Read more
Image
24 May 2022

Successful (re)certification VCA 2017/6.0


Vink Systemen’ current VCA certificate expires in June. For this reason, recertification took place in the month of April. This recertification was conducted in accordance
Read more
Image
4 May 2022

Project in pictures: Shell C30


The extraordinary work at Shell’s headquarters in The Hague can be seen in this project video. In almost 2 minutes, our work is summarized in
Read more
Dakkap met geïntegreerde opties
6 April 2022

Roof top with integrated options as desired


Several roof covers were produced this week. In consultation with the customer, the conduit and roof curb were integrated into the roof hoods. The fully
Read more
Image
4 April 2022

Galapagos Leiden project in focus


The Galapagos Leiden project was completed in the first quarter of 2022. The new Dutch headquarters of Galapagos has been built at Leiden Bio Science
Read more

ARE YOU RUNNING INTO SOMETHING?

We like to think with you!

Get in touch